Campus Construction Update: We’re Complete!
Atlanta’s John Marshall Law School (AJMLS) has relocated to the heart of Downtown, Atlanta, just over two miles south of its former Midtown location. The official new address of the Law School is:
Atlanta’s John Marshall Law School
245 Peachtree Center Avenue NE, Suite 1900
Atlanta, Georgia 30303
The Law School secured the prominent architectural firm, SSOE | Stevens & Wilkinson, a full-service architecture, engineering and interior design firm, to lead the multi-floor construction of the new facilities in the renowned Marquis Towers. This will place the Law School at the center of commerce, hospitality, entertainment, transit, retail, and so much more, and will establish Atlanta’s John Marshall Law School as the newest law school facility in the state of Georgia. Stay tuned on this page for construction updates!
Fall 2021: Construction Complete
October 20, 2021Atlanta’s John Marshall Law School was thrilled to open its new doors for the start of Fall 2021 classes. Welcome to the NEW Atlanta’s John Marshall Law School!
August 4, 2021
August 4, 2021Each day, the campus looks entirely different and more ready for us to open our doors. Did you know, our classrooms have stadium seating? There are options for students to sit or stand depending on their comfort level.
July 28, 2021
July 28, 2021We’re almost ready! Books are being set-up in the library and furniture, computers, and AV equipment are being installed. Right on track for the start of the fall semester.
July 23, 2021
July 23, 2021As we approach orientation and the fall semester, the campus is getting closer and closer to occupancy. The furniture is arriving and the library shelves are being installed.
July 14, 2021
July 14, 2021Each week, the rooms become more defined for their intended use and the aesthetic finishes more apparent. The mock courtroom, the offices, the podiums, and study rooms; we can’t wait to welcome everyone this fall to our new campus!
July 7, 2021
July 7, 2021The team continued to see more progress on the floors and ceilings this week. The classrooms, offices, and common areas are looking great. Construction is still on schedule and we look forward to welcoming students back to campus this fall.
June 30, 2021
June 30, 2021This week’s construction meeting might have shown the greatest progress to date. There is carpet and paint throughout a large portion of the project.
June 23, 2021
June 23, 2021With a month of construction left to go, the campus is starting to really take shape. The weekly site visits are going well and we are on schedule.
June 16, 2021
June 16, 2021In addition to the standard weekly photos from the construction site visit, the library staff helped give us some library specific images. The study rooms are looking great! Library Campus
June 9, 2021
June 9, 2021Each week, we are blown away by the natural light that fills our new space. All the little details from signage to finishes are being solidified. We look forward to the weekly meetings to see all the progress… and never tire of seeing the grand spiral staircase.
June 2, 2021
June 2, 2021After the long holiday weekend, the team was back onsite checking the progress of the new campus. More drywall progress and wall layout are happening.
May 26, 2021
May 26, 2021The site team made their weekly visit to the construction site.
May 18, 2021
May 18, 2021Weekly update from the site team. Dean Jace C. Gatewood and administrators meet with the designers on-site to review progress and work through challenges. Renovating a state-of-the-art campus facility in a pandemic is no small feat.
May 13, 2021
May 13, 2021The front desk area will welcome current and future students into their law school. You’ll find screens on the walls listing upcoming campus events and a law school directory.
May 5, 2021
May 5, 2021It’s exciting to see the classrooms and offices take shape and to see the once empty space turn into a law school. Skilled attorneys will walk these halls.
April 28, 2021
April 28, 2021The drywall install is progressing nicely this week. The rooms are really starting to take shape and outlines of classrooms, offices, and corridors are looking great.
April 21, 2021
April 21, 2021Weekly team site visit – excellent progress this week seeing the wall layouts and drywall ready for install. The floor to ceiling windows let in great natural light.
April 14, 2021
April 14, 2021Updates from the team. On-site meetings occur weekly between the Law School administration and construction team to keep the project on track and address questions. Check out the beautiful spiral staircase that connects the floors!
April 9, 2021
April 9, 2021Weekly construction check-in at Atlanta’s John Marshall Law School’s new Downtown campus. Dean Jace C. Gatewood meets the construction team weekly to check progress and address questions.